A fault code starts the investigation.
First, NSE reviews the equipment, application, operating risk and required timescale.
New Start Energy
Independent VSD and VFD fault assessment, workshop repair, parameter recovery, retrofit planning, installation and commissioning across the UK.
First, NSE reviews the equipment, application, operating risk and required timescale.
Next, send the full fault code, drive and motor nameplates, application details, photographs and any available parameter backup.
NSE then selects bench assessment, on-site repair, replacement or upgrade from the evidence, risk and parts availability.


Finally, share the equipment, application, operating risk and timescale. The engineering team can then identify the right next action.
A useful repair decision starts with the application, failure evidence and condition of the complete drive, not just the visibly damaged component.
Confirm type code, rating, application, fault history, contamination, cooling and visible damage.
NSE assesses power-stage, control-board, fan, capacitor, power-supply and ancillary defects. We then repair them where technically sound.
After repair, NSE electrically checks and functionally tests the equipment before recommissioning.
Where possible, NSE preserves or reconstructs available backups, option-card settings, motor data and application parameters.
Next, NSE proves the drive with its motor, controls, process and safety arrangements.
However, condition, obsolescence or risk may make repair unsuitable. In that case, NSE defines hire, replacement or engineered upgrade options.
The completed work should explain the likely cause, confirm the recovery, and identify any cooling, supply, motor or process issue that could cause a repeat failure.
Workshop capability
Drives, soft starters, power supplies, HMIs, PLC hardware, PCBs and selected control assemblies.



Often, but the decision depends on fault evidence, age, condition, parts availability, application risk and recovery time. NSE compares repair, replacement and temporary-hire routes.
Send the manufacturer, complete model code, serial number, motor rating, supply voltage, fault message, application, photographs, available backup, postcode and timescale.
No. A trip can be caused by the supply, motor, cabling, cooling, control signals, communications or process as well as the drive itself.
We use cookies to improve your experience on our site. By using our site, you consent to cookies.
Manage your cookie preferences below:
Essential cookies enable basic functions and are necessary for the proper function of the website.
Google reCAPTCHA helps protect websites from spam and abuse by verifying user interactions through challenges.
Google Tag Manager simplifies the management of marketing tags on your website without code changes.
Statistics cookies collect information anonymously. This information helps us understand how visitors use our website.
Google Analytics is a powerful tool that tracks and analyzes website traffic for informed marketing decisions.
Service URL: policies.google.com (opens in a new window)
Marketing cookies are used to follow visitors to websites. The intention is to show ads that are relevant and engaging to the individual user.
Measures website visits and form conversions for LinkedIn advertising when marketing consent is granted.
Service URL: www.linkedin.com (opens in a new window)
You can find more information in our Cookie Policy and .

Do not open energised equipment or bypass safety systems. For urgent breakdown support call 0330 153 9188.